Reported in article "Flood Control Project Inspected: FIRST CONCRETE POURED IN PACOIMA DAM County Supervisors Pull Lever Sending Initial Batch of Mixture to Base of Structure That Will Rise in Year to 395-Foot Height," Los Angeles Times, 06 Aug 1926: A1.
Workers at the bottom of the canyon at the Pacoima Dam site working on wood framing and concrete pouring. Men in suits and women wearing dresses and sun hats observe.
Photo appears with article "Flood Control Project Inspected: FIRST CONCRETE POURED IN PACOIMA DAM County Supervisors Pull Lever Sending Initial Batch of Mixture to Base of Structure That Will Rise in Year to 395-Foot Height," Los Angeles Times, 06 Aug 1926: A1.
Wooden construction tower attached to a wooden building in the mountainside at the Pacoima Dam construction site. Workers stand on a wooden bridge near the entrance of the building.